Josiah College
Originally built in 2018, the second 2023 stage of this visionary college included all the roofs – Cooldek®, Topdek® to the curved CGI 16mm corrugated walkways. These are a focal point due to the reverse of the sheet so that you can see the corrugation both top and bottom. It also features curved Pittsburgh flashings for the barge caps.